All About Asphalt Paving LLC

Asphalt Paving and Sealcoating | Quality Work, Competitive Pricing

Parking Lot Installation

During Sealcoating (9 of 14)

« Back to Album Photo 13 of 20 Previous | Next
During Sealcoating (9 of 14)
Contractors Grade Coal Tar Sealant is a thick emulsion solution poured directly on the pavement surface and spread evenly over the entire prepared surface, Allow 8 to 12 hours for drying, additional drying may be required due to humidity, texture of pavement surface and shaded areas. This entire application is guaranteed 2 years against gas and oil damage.
Posted on March 24, 2011 Slideshow